How to Use Al-Asr Planner
Practical guide for planners, engineers and project managers new to Al-Asr Planner.
Hierarchy at a glance
Enterprise
→ EPS Level 1
→ EPS Level 2 / Line of Business
→ EPS Level 3
→ EPS Level 4
→ Project
→ WBS
→ Activity1. Understanding the hierarchy
Al-Asr Planner uses a familiar structure: Enterprise → EPS levels → Line of Business → Project → WBS → Activity. You do not need to use every level.
2. Creating EPS levels
In the workspace, use the toolbar to add EPS nodes under the Enterprise root, up to four levels deep.
3. Creating a project
Use the New Project button. Provide a code, name and planned start date.
4. Creating a project calendar
Each project uses a calendar to determine working and non-working days. The default is a 5-day workweek.
5. Creating the WBS
Add WBS rows to group activities by discipline, area or phase.
6. Adding activities
Add task activities under WBS rows. Set the duration in working days and a planned start.
7. Adding milestones
Add a milestone for key events. Milestones have zero duration and appear as a diamond in the Gantt chart.
8. Setting dates and duration
Type the start date and duration; finish is calculated using the project calendar.
9. Updating activity progress
Edit % Complete inline. Status updates automatically (Not Started, In Progress, Completed).
10. Predecessors
Open the details panel and add predecessors using the FS, SS, FF or SF relationships with optional lag.
11. Using the Gantt chart
Bars appear alongside every row. Selected rows highlight. Milestones show as diamonds.
12. Expanding and collapsing
Click the caret on WBS rows to hide or reveal descendants.
13. Adjusting the timeline scale
Use the Zoom In and Zoom Out buttons to change the day width.
14. Exporting CSV
Use the Export CSV button to download the activity list.
15. Exporting landscape PDF
Use the Export PDF button; your browser's print dialog opens with landscape A3 layout applied.
16. Backing up and restoring
Use Backup JSON to download all planner data, and Restore to load it later.
17. Local browser storage
Version 1 stores everything in this browser. Clearing browser data may remove your projects — download a backup regularly.
Glossary
- EPS
- Enterprise Project Structure — a hierarchy that groups projects.
- LOB
- Line of Business — a grouping used inside the EPS.
- WBS
- Work Breakdown Structure — a hierarchical decomposition of a project's deliverables.
- Activity
- A single scheduled task with a duration, start and finish.
- Milestone
- A zero-duration marker for a significant event.
- Duration
- The number of working days an activity takes to complete.
- Predecessor / Successor
- Activities that must precede or follow another activity.
- Baseline
- A snapshot of the schedule used for later comparison.
- Data Date
- The date up to which progress has been recorded.
- Gantt Chart
- A time-scaled bar chart of activities.